Skip navigation
Please use this identifier to cite or link to this item: http://arks.princeton.edu/ark:/88435/dsp0102870z17b
Full metadata record
DC FieldValueLanguage
dc.contributorWhite, Claire-
dc.contributor.advisorMeggers, Forrest-
dc.contributor.authorByers, Conleigh-
dc.date.accessioned2015-06-11T14:42:41Z-
dc.date.available2015-06-11T14:42:41Z-
dc.date.created2015-04-13-
dc.date.issued2015-06-11-
dc.identifier.urihttp://arks.princeton.edu/ark:/88435/dsp0102870z17b-
dc.description.abstractN/Aen_US
dc.format.extent110 pages*
dc.language.isoen_USen_US
dc.titleBeyond grid parity: Variability costs of incorporation of intermittent renewable energy in the PJM Interconnectionen_US
dc.typePrinceton University Senior Theses-
pu.date.classyear2015en_US
pu.departmentCivil and Environmental Engineeringen_US
pu.pdf.coverpageSeniorThesisCoverPage-
Appears in Collections:Civil and Environmental Engineering, 2000-2020

Files in This Item:
File SizeFormat 
PUTheses2015-Byers_Conleigh.pdf1.63 MBAdobe PDF    Request a copy


Items in Dataspace are protected by copyright, with all rights reserved, unless otherwise indicated.